Publications
19

BREAKING A DESTRUCTIVE CYCLE

posted on
BREAKING A DESTRUCTIVE CYCLE

When one of the state’s oldest cities is also its fastest growing, there are bound to be infrastructure issues. Such is the case in Laredo, Texas, a city of 250,000 that was founded way back in 1755. Growth has put significant stress on the city’s aging — and in places antique — sewer infrastructure. “We have 700 miles of pipe in our sanitary sewer network, half clay and half PVC,” says Angel Leon, Laredo Wastewater Collection superintendent. “PVC and some new clay was installed in the ’80s and ’90s, but much of the clay in the downtown area is over a hundred years old.”

Click the document link below to read the complete article (PDF)

| Categories: Case Studies | Tags: | View Count: (478) | Return

Attachments

  1. Laredo-MunicipalSewerandWater-Feb2019.pdf 2/19/2019 12:29:54 PM
Facebook
Publication Categories
Search Publications
Recent Articles
  • The AP/M Permaform, CentriPipe, ConShield family has lost a valued and admired colleague and friend. In his role as President of Multi Utilities Ventures, Tom Perry had a strong background in the util...
    Read More
  • Corrosion-resistant manhole rehab system solves a significant problem with Laredo’s aging infrastructure. When one of the state’s oldest cities is also its fastest growing, there are bound to be inf...
    Read More
  • MIC-resistant Concrete Admixture and Spincasting Rescue Sewer Manholes. Laredo, Texas, founded in 1755, is a particularly old city. With a population of 250,000 it’s also one of Texas’ biggest citie...
    Read More